Perulack Compressor Station

  • Year: 2022
  • Project Start:  April 2022
  • Project Finish: December 2023
  • Location: East Waterford, Pennsylvania
  • Classification: Brownfield Compressor Station

High Level Overview:

The Perulack Compressor Station consists of two phases:

Phase I included installing new coolers, filter separators, auxiliary building (616 sq ft), electrical control building, equipment and generator building, and upgrading the ESD system in preparation for the 2023 scope. 

Phase II included demo of the existing compressor building and installing two T-130 Turbine Compressors with all ancillary equipment including intake, exhaust, lube oil coolers, ESD skids, domestic gas skid, and compressor building (9,450 sq ft).