Upgrades to an existing M&R station to increase capacity and update facility. Scope of work included construction of foundations and installation of temporary Meter & Regulator skids and bypass piping to allow selective demolition at meter station to begin. Replacement of 26” Inlet and Outlet piping with 30” headers and upgrading branch piping to meter tubes. Install new structural steel and place new cast in place concrete slab on deck. Install new RTU building, emergency generator, fluid storage tank, blowdown stack, and utility connections. Upgrades to building included new interior finishes, building electrical, controls/instrumentation, and ventilation system. Removal and transportation of temporary skids offsite and removal of bypass piping once project was completed.