Keuka Pedestrian Bridge

  • Project Name: Keuka Pedestrian Bridge
  • Year: 2021
  • Project Start: Spring
  • Project Finish: Spring

High Level Overview: As part of the Keuka Lake Access Improvements, LMC was contracted to fabricate a 98’ long x 8’ wide weathering pedestrian bridge to connect the Champlin Beach area to adjacent Curtiss Park.